Miso Loss Of Control Room Capabilities

  • country United States of America
  • region Indiana
  • categories No content
  • impacts Balancing authority events
  • start 01 March 2023 at 12:03:00 America/Indiana/Indianapolis
  • end 01 March 2023 at 12:03:00 America/Indiana/Indianapolis
  • duration 40 minutes
  • primary cause Loss of monitoring or control capability at control center
  • secondary causes No content
  • load lost No content
  • number of customers affected No content
  • end of disturbance criteria No content

why this is interesting

No content here.

description

MISO experienced a “complete loss of monitoring or control capability” at its control center, setting off short-lived energy imbalances. 

The glitch led to an imbalance in its balancing authority and a Balancing Authority ACE Limit (BAAL) event. Its area control error (ACE) reached as high as 2,000 MW, resulting in a 17-minute BAAL event.
The ACE then swung as low as -4,285 MW, resulting in a second BAAL event for 11 minutes.

Reference: https://www.rtoinsider.com/31784-miso-reports-loss-control-room-capabilities/?utm_source=hootsuite&utm_medium&utm_term&utm_content&utm_campaign 