Queensland Power Outage

  • country Australia
  • region Queensland
  • categories Generator turbine fire
  • impacts Load shedding
  • start 25 May 2021 at 03:05:00 Australia/Brisbane
  • end 25 May 2021 at 05:05:00 Australia/Brisbane
  • duration 1 hour 45 minutes
  • primary cause Coal Plant explosion and fire
  • secondary causes No content
  • load lost 2
  • number of customers affected No content
  • end of disturbance criteria No content

why this is interesting

  • A fire in one of the turbine halls at the power station, forced all three of its units offline
  • The nearby Stanwell power plant were fined 260k (AUD) as they set all the units with an under voltage setting of 0.85pu for 0.1s. The fine was because they applied the setting without notifying AEMO and also that the setting conflicted with the ride-through requirement of 10 seconds.

description

Final report from AEMO is available Power System Incident Qld 25 May 21 Incident Report (aemo.com.au)

https://reneweconomy-com-au.cdn.ampproject.org/c/s/reneweconomy.com.au/coal-generator-fined-for-lousy-response-to-coal-plant-explosion-that-rocked-the-grid/amp/

 

 