Sri Lanka Blackout

  • country Sri Lanka
  • region Colombo
  • categories No content
  • impacts No content
  • start 09 December 2023 at 17:12:00 Asia/Colombo
  • end 09 December 2023 at 20:12:00 Asia/Colombo
  • duration 3 hours
  • primary cause Failure of transmission line
  • secondary causes No content
  • load lost No content
  • number of customers affected No content
  • end of disturbance criteria No content

why this is interesting

The line that tripped out due to a lightning strike was carrying 500 MW - 1/3 of the total country's demand 

description

  • The  transmission line from Kotmale to Biyagama which tripped due to a  lightning strike was carrying about 500MW, while the total country’s  demand was around 1500MW.
  • The tripping of the line resulted in the loss of one-third of the  supply, leading to a severe under-frequency below the limits tolerable  by the other generators supplying the load.
  • Consequently, these  generators also tripped, causing an island-wide blackout