Brazil Blackout

  • country Brazil
  • region Sao Paulo
  • categories No content
  • impacts System blackouts
  • start 15 August 2023 at 08:08:00 America/Sao_Paulo
  • end 15 August 2023 at 14:08:00 America/Sao_Paulo
  • duration 6 hours
  • primary cause Under investigation
  • secondary causes High voltage transmission line tripping
  • load lost 18.9
  • number of customers affected 29000000
  • end of disturbance criteria No content

why this is interesting

No content here.

description

  • 500 kV Quixadá – Fortaleza II line tripped due to misoperation of protection. No fault, overload, bad weather, or other obvious cause was present.
  • The tripping resulted in a voltage sag and triggered voltage and frequency oscillations and out-of-step protection tripped 600ms later to split the grid into 3 islands
  • Approximately 46 lines tripped across 230 and 500 kV grids