Generators Tripping
- event System Separation In The Continental Europe Synchronous Area
- category Activated system protection schemes
- contingency type Busbar coupler CB tripping
- primary cause Busbar overcurrent protection tripping
- secondary causes Power swing
- impacts No content
- mitigations No content
- number of customers affected No content
- epri research program Program 40: Transmission Planning
- epri research project P40.018: Transmission Protection Support Tools
- epri research deliverable Performance of Grid Protection During Stable and Unstable Power Swings
description
The internal special protection scheme in Turkey in the Marmara region prevented an overload of the important Badirma-Bursa corridor by shedding 975 MW of power generation, which had fed power to the Turkish system over this corridor.