System resynchronization:

  1. The busbar coupler 400kV in Ernestinovo (HR) was switched on at 15:07:25,
  2. Immediately after confirmation that the first step was successful, OHL 400 kV Novi Sad 3 (RS) – Subotica 3 (RS) was switched on at 15:08:20,
  3. Immediately after confirmation that the second step was successful, OHL 400 kV Konjsko (HR) – Velebit (HR) was switched on at 15:09:38,
  4. Transelectrica was informed that EMS, NOS BIH and HOPS had made reconnections, so the internal line connection in Transelectrica could be started,
  5. Transelectrica switched on OHL 400 kV Sibiu Sud – Mintia at 15:10, and afterward, OHLs 400 kV Iernut – Sibiu Sud & 400 kV Iernut – Gădălin at 15:12,
  6. HOPS and NOSBiH switched on other tripped lines:
  7. Transelectrica proceeded to reconnect the rest of the tripped lines and transformers:
  8. EMS and HOPS proceeded to reconnect the tripped 110 kV OHLs.